Application
Apply 2 to 3 single coats allowing flash to hand slick (5-10 min.) between coats. Notes: Cooler temperatures and thicker films may require longer flash times. Do not expose to rain or excessive moisture for 24 hours. Applying decals best after 7 days or full cure to avoid decal blistering. Applying more than 3 coats is not recommended. When baking, no flash time needed. Go straight to bake.
Air Dry |
Force Dry |
Hand slick: 30 minutes @ 77°F (25°C) |
30 minutes at 140°F (60°C) |
To light polish: 8 hours |
|
Dry Film Thickness (mil)
1.0-1.5