Montana

Montana Big Sky™ PS5009A 2K Urethane Primer Gray
Montana Big Sky™ PS5009A 2K Urethane Primer Gray

PS5009A are two-component urethane primers designed to offer high film build, quick and easy sanding, while maintaining superior gloss and DOI. Both meet the National Rule requirement of 4.80 lbs/gal VOC (575 g/L) for primers.

Features
  • High Film Build
  • Minimal Shrinkage
  • Primer Surfacer or Sealer
MSDS TDS English TDS Spanish

Product Details

Type Primer
Substrates • Properly cleaned steel, aluminum, and galvanized steel
• PS3042/PS3044/PS3045 Epoxy Primer
• *Allow epoxy to flash for 1 hour prior to applying PS5008A or PS5009A
• PS3008™ ViperGrip II™ Metal-Etch Primer
• Thoroughly sanded OEM and cured paint
• Sanded fiberglass / SMC
• Cured body filler
VOC Mix 4:1 4.49 lbs/gal (538 g/l); Mix 4:1:2 < 4.50 lbs/gal (539 g/l)
Available Sizes
Size Case Qty UPC GMC
Quart 12
Gallon 4

Mixing Instructions

Components : Primer-Surfacer Parts by Volume
PS5009A 4
PS5008B 1
TH0860/TH0870/TH0885/TH0895 3/4 Opt Reduction
Components : Primer-Sealer Parts by Volume
PS5009A 4
PS5008B 1
TH035/TH036/TH037 2
Sealer Option: use 2 parts Low VOC Reducer
Viscosity
N/A
Pot Life
Catalyzed Primer: 1 hour @ 75°F/23°C Sealer: 2 hours @ 75°F/23°C

Application Instructions

Application
PRMER
Apply over properly prepared surfaces. Apply in single full wet coats, allowing 5 – 10 minuteflash between coats. For best results, do not apply more than 3 coats.

BRUSHABLE / ROLLABLE OPTION
Mix according to directions. A small amount of reducer will improve flow. Apply 1 even coatof PS500XA Urethane Primer, making sure to cover the repair area completely into thefeatheredge. If a second coat is applied, allow a 5 -10 minute flash between coats. Apply thesecond coat within the first coats’ outer edge. For best results, do not apply more than 3coats.

SEALER
Apply 1 single wet coat of properly mixed PS500XA as a sealer to create a uniform base.Allow to flash for 30 – 45 minutes before applying topcoats.
Gun Setup & Air Pressure
Refer to Technical Data Sheet.

Dry Time

Air Dry Force Dry
Dry to sand Primer: 1 – 1 ½ -hours per coat at 75°F/23°C
To topcoat Primer: 4 - 6 hours after sanding.
Sealer: 20 – 30 minutes at 75°F/23°C
Coverage (Ft2)
4:1 642; 4:1:2 458
Dry Film Thickness (mil)
Mix 4:1 2.2 + 0.3 mils per coat; Mix 4:1:2 + 0.5

Special Instructions

Safety

Refer to the product Technical Data Sheet for complete directions for use. Refer to the product Safety Data Sheet for safety information. For use by professional, trained painters.

Packaging Information

You must be an Axalta Coating Systems authorized distributor to view pricing information. Please Login or contact us to learn more.

LOGIN